Skip to content
HAILING · PRODUCTS & TECHNICAL RESOURCES

VFD Selection Guide

HL750 Series Frequency InvertersPV15000-48 P12.0 Solar InverterHL710 Solar Pump Inverters
Selection GuideSupport →
ENGINEERING SELECTION

Size the drive from the motor, the supply and the duty.

This guide explains how to approach VFD sizing, heavy versus light duty, voltage, braking, reactors and filters, and solar-pump PV-array estimates. General formulas follow the Hailing vector drive manual and the HL710 catalog; final values come from the model-specific rating table.

Open the document library → · Browse 26 application guides →

VFD sizing from motor power and current

Start with the motor nameplate. Record rated power, rated current, voltage, frequency, power factor if shown, and the mechanical duty (continuous, intermittent, starting frequency, inertia). The drive must be able to supply the motor current required by that duty.

  1. Read motor current and voltage from the nameplate.
  2. Classify the load: variable-torque (many pumps and fans) or constant-torque / shock (conveyors, crushers, hoists, machine tools).
  3. Where a series has a model table — such as HL710 and the PV families — select a model whose rated current and voltage cover the application.
  4. For other series, send us the nameplate and duty and we will match the model.

Browse the product center for model tables, and the application guides for process-specific checks. Product center

Heavy duty and light duty

The Hailing vector drive manual describes two overload classes:

G-type / heavy

150% / 60 s · 180% / 3 s

Discuss this class for constant-torque and shock loads such as conveyors, machine tools, crushers and hoists.

P-type / light

120% / 60 s · 150% / 3 s

Often discussed for centrifugal pumps and fans, provided the real operating point is not a heavy starting or overload case.

Confirm the overload class of the ordered series and model with our team.

Supply and motor voltage

The inverter input must match the site supply, and the inverter output must be compatible with the motor rated voltage. A single-phase supply cannot be assumed to feed a three-phase-only product. For PV and solar-pump models, use the exact model’s DC high-limit and MPPT window: cold-weather Voc must stay below the DC input limit, and hot-weather operating voltage should remain in the MPPT range. HL710 has separate GT2 and GT4 input families; select within one family.

Braking resistors and braking units

Regenerative energy during deceleration or lowering can raise the DC bus. A braking resistor dissipates that energy; some models also need a separate braking unit. The Hailing vector drive manual gives:

U × U / R = Pb

U is the braking voltage used for system-stabilization braking (the value of U varies with the system); R is the resistor value; Pb is braking power.

0.7 × Pr = Pb × D

Pr is resistor power; D is the frequency of braking — the proportion of the regenerative process in the whole working cycle. The 0.7 factor reflects that the resistor is not assumed to run at full thermal rating continuously. More frequent or severe braking needs a larger resistor.

Example: if a calculation gives Pb = 5 kW and braking occurs for 20% of the cycle (D = 0.2), then Pr ≈ (Pb × D) / 0.7 ≈ 1.4 kW as a starting figure, before temperature, derating and the actual braking voltage are confirmed.

Reactors, EMC filters and other accessories

Accessory types include input reactors, EMC filters, output reactors, an LCD keypad, I/O cards, RS485 and PG cards. RS485/Modbus is offered on some 750 and HL7000 configurations. Discuss the following with your enquiry:

  • Input reactor or filter: weak supply, high fault level, or a stated harmonic/EMC limit.
  • Output reactor or dV/dt measures: long motor cables or sensitive insulation.
  • Communications or encoder cards: according to the ordered model.

Solar-pump PV array sizing (HL710)

For borehole and irrigation pumping with the HL710 family, the HL710 catalog recommends: PV array power can be 1.2–1.6 times the pump power. Use that envelope together with the model table, not instead of it.

Parray ≈ (1.2 … 1.6) × Ppump

Worked example. Pump electrical power 15 kW. A mid-range factor of 1.3 gives P_array ≈ 19.5 kW as a first estimate. Then:

  1. Choose a specific HL710 GT2 or GT4 model whose motor-current and PV-input rows cover the pump and the proposed strings.
  2. Compute string Voc at the lowest expected module temperature and confirm it stays below that model’s DC limit.
  3. Compute operating voltage at high module temperature and confirm it remains in the relevant MPPT range.
  4. Size daily water storage so that delivery is judged by metered volume, not by controller kilowatts.

Solar irrigation guide · Borehole & deep-well guide · HL710

Frequently asked questions

How should I size a frequency inverter from motor power and current?

Start from the motor nameplate: rated current, voltage, frequency and power. Choose a drive whose rated output current is at least the motor rated current for the intended duty, then check supply voltage and overload needs. For series without a model table on this site, send us the nameplate and duty and we will recommend a model.

What is the difference between heavy (G) and light (P) duty?

The Hailing vector drive manual describes a G-type (heavy) overload as 150% for 60 s and 180% for 3 s, and a P-type (light) overload as 120% for 60 s and 150% for 3 s. Pumps and fans are often discussed as lighter duty; conveyors, crushers, hoists and machine tools usually need a heavy-duty discussion. Confirm the overload class for the ordered model with our team.

How do I choose the supply voltage?

Match the drive input to the actual site supply and the motor rated voltage. For solar-pump and PV products, use the model-specific DC and AC limits in the datasheet or HL710 catalog — especially cold-weather Voc, which must stay below the DC input limit.

When is a braking resistor or braking unit needed?

When the motor returns energy during deceleration or lowering — typical of hoists, some conveyors, centrifuges and high-inertia machines — the DC bus can rise and a resistor or braking unit may be required. The Hailing vector drive manual gives the starting relations U×U/R = Pb and 0.7×Pr = Pb×D, where U is the braking voltage used for stabilization, Pb is braking power, Pr is resistor power and D is the fraction of the cycle that is regenerative. Confirm whether the ordered model includes a built-in braking unit.

When are input reactors, output reactors or EMC filters needed?

Input reactors, EMC filters and output reactors are available as drive accessories. Typical project reasons include a weak or high-fault-level supply, long motor cables, or a stated EMC requirement. Tell us the cable length, supply condition and EMC standard and we will confirm the accessories for the ordered model.

How do I size a PV array for an HL710 solar pump?

The HL710 catalog states that PV array power can be 1.2–1.6 times the pump power. That ratio is a starting envelope, not a flow guarantee. You must also keep cold-weather string Voc below the exact GT2/GT4 model’s DC limit and keep operating voltage in the relevant MPPT range, and check motor current against the HL710 model table. Worked example: a 15 kW pump with a mid-range factor of 1.3 gives a 19.5 kW array as a first estimate; the string configuration is then checked against the chosen HL710 model.

Which accessories are available?

Accessory types include an LCD keypad, braking components, I/O cards, RS485 and PG cards. RS485/Modbus communication is offered on some 750 and HL7000 configurations. Confirm the accessory options for the ordered model with our team.

For a project review, send the motor nameplate, supply details and process duty from the contact page. Contact Hailing →